Modelowanie i Projektowanie Architektury Oprogramowania
Systemy Informatyczne
Dodocum modeler [english]

NEW !!!
Event-driven Process Chain (EPC) modeler & Swimlane Model diagram (Rummler-Brache vel Cross Functional Flowchart vel Cross Functional Process Flow) for Topcased 5.x (after installing the environment Topcased upload the next plug-ins to the topcased directory \dropins): 

EPC plug-ins

Swimlane Model plug-ins
Epc & Swimlane Model samples: (File->Import->General->Existing Projects into Workspace->Next, Select root directory: "...\EPC" or "...\Swim" ->Finish).

Dodocum and BPMN 2.0 modeler for Topcased 5.1 (after installing the environment Topcased upload the Dodocum plug-ins to the topcased directory \dropins):
 


 


Our samples: (File->Import->General->Existing Projects into Workspace->Next, Select root directory:  "...\Sample"->Finish). 
Installation of the Dodocum modeler should start with the installation of the Topcased environment. Before installing the Topcased environment, make sure that the computer has a Java virtual machine already installed. In the absence of this component you should download the appropriate package from http://java.sun.com/j2se and install it in the preferred folder on your computer. After installing the Java Virtual Machine, you can proceed to install the Topcased environment. Download the corresponding version of the Topcased environment from http://www.topcased.org/ (org.topcased.rcp-win32-M-1.3.0-200802191607.zip - Windows, org.topcased.rcp-linux-M-1.3.0-200802191607.zip - Linux, org.topcased.rcp-mac-M-1.3.0-200802191607.zip - Mac) in the appropriate directory (eg C:\topcased).
After installing the environment Topcased upload the Dodocum plug-ins to the topcased directory \plugins (all plugins are avaiable from dodokum.zip file also):